Permit
Local ordinance, not the state
The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). So the township code office in Germany is the one to ask before work starts.
Source: 34 Pa. Code § 403.1(b)
Half of the 1,086 homes in Germany were built before 1983. The rules below decide how much of the old roof has to come off and what goes under the new one.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). So the township code office in Germany is the one to ask before work starts.
Source: 34 Pa. Code § 403.1(b)
Layers
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 47% of Germany’s homes were built before 1980, so count the layers before comparing quotes.
Ice barrier
Whether an eave membrane is a code item depends on the climate table the municipality filled in when it adopted the code (IRC R905.1.2, Table R301.2). The contractor or the township code office in Germany will know.
Checked against the code text on October 24, 2026. Code edition, permit and contract rules for the whole state: roof replacement in Pennsylvania.
Of 1,043 occupied homes in Germany, 978 (94%) are owner-occupied. Counting by decade, 17% before 1940, 29% before 1960, 47% before 1980 of the housing was in place, and 34% dates from 2000 on. (ACS 2020–2024.)
The housing is 96% detached houses.
34% of homes here were built in 2000 or later. HUD’s useful-life table gives an asphalt-shingle roof 20 years, so roofs on houses from the early 2000s are reaching that age.
Of the 28 Adams County municipalities on this site, Germany has the 15th largest share of homes built before 1980: 47%, against a county range of 26% to 87%.
ZIP codes: 17340
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Germany | 1983 | 47% | 94% | 3% | 17 |
| Littlestown | 1966 | 54% | 72% | 19% | 19 |
| Union Township, Adams County | 1984 | 41% | 90% | 0% | 18 |
| Mount Joy Township, Adams County | 1980 | 50% | 86% | 3% | 10 |
| Bonneauville | 1982 | 48% | 63% | 22% | 16 |
| Conewago Township, Adams County | 1989 | 37% | 87% | 21% | 17 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
NOAA’s storm reports show 17 days since 2006 with hail of at least 1 inch inside a 10-mile circle around Germany, topping out at 1.75 in on September 21, 2024. The most recent was March 16, 2025.
That is more hail days than 79% of the places in the state on this site.
At the county level, Germany shares Adams County’s record of 3 storm disaster declarations since 2006, the newest DR-4267 (Severe Winter Storm and Snowstorm, March 2016). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
Useful life is HUD’s planning figure, not a warranty. More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 96% of homes here are detached | Wind class set by the design wind speed (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Roofs that will carry solar later | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older houses; 17% here predate 1940 | Never a base for a new layer (R908.3.1.1); heavy |
| Flat roof: EPDM or TPO | 15 years | Additions and porch roofs | Where the roof meets a wall or parapet |
Pennsylvania’s home improvement law (HICPA § 3, § 6) requires registration with the Attorney General from $5,000 a year of such work and puts the number on every estimate; ask for it in Germany and look it up.
Contracts, deposits and the right to cancel: checking a roofing contractor. What moves the price: new roof cost in Pennsylvania.
Local ordinance, not the state. The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). So the township code office in Germany is the one to ask before work starts.
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 47% of Germany’s homes were built before 1980, so count the layers before comparing quotes.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Germany was built in 1983, 47% of homes were built before 1980, 94% are owner-occupied.
Hail of 1 inch or larger was reported on 17 days within 10 miles of Germany from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
Pennsylvania’s home improvement law (HICPA § 3, § 6) requires registration with the Attorney General from $5,000 a year of such work and puts the number on every estimate; ask for it in Germany and look it up.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.