Permit
A permit is needed
Florida’s code exempts no building work from permits (FBC Building § 105.2); in Bokeelia the reroof permit comes from Lee County’s building department.
Half of the 3,005 homes in Bokeelia were built before 1989. 68% predate 2000, and Florida’s reroof rules depend on when the house was permitted.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Florida’s code exempts no building work from permits (FBC Building § 105.2); in Bokeelia the reroof permit comes from Lee County’s building department.
Layers
A tear-off to the deck is required where the roof already has two layers, where the covering is tile, slate or wood shake, or where it is water-soaked or deteriorated (FBC Existing Building 706.3).
The 25 percent rule
Florida limits partial work: if more than 25 percent of a roof or roof section is redone in 12 months, the whole roof or section has to meet the current code. Roofs built or replaced under the 2007 Florida Building Code or later are exempt; only the new part must meet the code in effect (FBC Existing Building 706.1.1; Fla. Stat. § 553.844(5)).
Source: FBC Existing Building, 8th ed. (2023), Chapter 7; Fla. Stat. § 553.844
Houses permitted before 2002
If your site-built single-family home was permitted before the Florida Building Code took effect (March 1, 2002), a full roof replacement must include a secondary water barrier and re-nailing of the roof deck: at least two 8d nails per rafter, a nail counting as 8d if it is at least 0.113 inch thick and 2¼ inches long (Fla. Stat. § 553.844(3); FBC Existing Building 706.7).
68% of homes in Bokeelia were built before 2000 (ACS); the year the house was permitted is what counts.
Source: Fla. Stat. § 553.844; FBC Existing Building, 8th ed. (2023), Chapter 7
Checked against the code text on October 24, 2026. Everything else the state requires: roof replacement in Florida.
Owners live in 1,464 of Bokeelia’s occupied homes, or 84%. Counting by decade, 6% before 1960, 23% before 1980, 68% before 2000 of the housing was in place, and 33% dates from 2000 on. (ACS 2020–2024.)
The housing is 62% detached houses, 10% buildings of two to four units, 17% manufactured homes.
32% of the homes in Bokeelia are seasonal or occasional-use homes (ACS 2020–2024). If yours is one of them and you live elsewhere, the call still has to come from you as the owner.
Of the 14 Lee County places on this site, Bokeelia has the 5th largest share of homes built before 2000: 68%, against a county range of 28% to 87%.
ZIP codes: 33922
| Place | Median built | Before 2000 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Bokeelia | 1989 | 68% | 84% | 3% | 1 |
| Pine Island Center | 1986 | 80% | 72% | 3% | 2 |
| Burnt Store Marina | 1996 | 64% | 88% | 10% | 1 |
| Cape Coral | 2001 | 40% | 79% | 4% | 9 |
| St. James City | 1986 | 76% | 91% | 2% | 3 |
| Punta Gorda | 1997 | 56% | 85% | 5% | 3 |
Median built: median year the homes were built. Before 2000: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
NOAA’s storm reports show 1 day since 2006 with hail of at least 1 inch inside a 10-mile circle around Bokeelia, topping out at 1 in on March 1, 2017.
That is fewer than most places in the state on this site (median 7 days).
At the county level, Bokeelia shares Lee County’s record of 9 storm disaster declarations since 2006, the newest DR-4834 (Hurricane Milton, October 2024). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
Useful life is HUD’s planning figure, not a warranty. More in the guides to shingles, metal, slate, tile and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 62% of homes here are detached | Wind class set by the design wind speed (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Roofs that will carry solar later | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older and historic houses | Can’t be roofed over; check the framing for the weight |
| Clay or concrete tile | 60 years | Houses framed for tile | Can’t be roofed over (FBC-EB 706.3) |
| Flat roof: EPDM or TPO | 15 years | Additions and porch roofs | Coating is not a replacement |
Ask anyone quoting a roof in Bokeelia for a Florida license number, Certified Roofing Contractor (CCC, statewide) or Registered Roofing Contractor (RC, local), and check it on DBPR; 9,419 CCC licenses were active on October 23, 2026.
Contracts, deposits and the right to cancel: Florida roofing licenses. What moves the price: new roof cost in Florida.
A permit is needed. Florida’s code exempts no building work from permits (FBC Building § 105.2); in Bokeelia the reroof permit comes from Lee County’s building department.
A tear-off to the deck is required where the roof already has two layers, where the covering is tile, slate or wood shake, or where it is water-soaked or deteriorated (FBC Existing Building 706.3).
By the Census Bureau’s American Community Survey (2020–2024), the median home in Bokeelia was built in 1989, 68% of homes were built before 2000, 84% are owner-occupied.
Hail of 1 inch or larger was reported on 1 day within 10 miles of Bokeelia from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
Ask anyone quoting a roof in Bokeelia for a Florida license number, Certified Roofing Contractor (CCC, statewide) or Registered Roofing Contractor (RC, local), and check it on DBPR; 9,419 CCC licenses were active on October 23, 2026.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.