Half of the 9,900 homes in Stonington were built before 1968. The rules below decide how much of the old roof has to come off and what goes under the new one.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.
The rules for a reroof in Stonington
Permit
The 25 percent line
Without a permit, Connecticut allows only:
Repairs that are limited to 25 percent of roof covering and building siding within one calendar year.
2022 CSBC, (Amd) R105.2, item 11
A whole new roof is more than that, so it goes to Stonington’s building official.
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 62% of Stonington’s homes were built before 1980, so count the layers before comparing quotes.
Required in Stonington, as in every Connecticut town
The state’s climate table marks the ice barrier “yes” statewide. That is a self-adhering membrane, or two cemented layers of underlayment, from the eave to at least 24 inches inside the wall line (IRC R905.1.2).
Connecticut adds a 4-inch self-adhering strip over all joints of a plywood or OSB deck ((Amd) R905.1.1). It is not needed under a fully adhered membrane, or on board decks under 3 feet wide, which matters in a town where 31% of homes predate 1940.
Stonington’s code design values are a 129 mph ultimate design wind speed and a 30 psf ground snow load; it is in Connecticut’s hurricane-prone region. At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Of 8,702 occupied homes in Stonington, 6,314 (73%) are owner-occupied. By year built, 31% before 1940, 43% before 1960, 62% before 1980; 16% went up in 2000 or later. (ACS 2020–2024.)
By building type: 71% detached houses, 5% attached single-family houses (rowhouses, twins and townhouses), 14% buildings of two to four units.
On a house built before 1940, ask what the deck is (boards or plywood) and whether slate sits under the later layers: slate can’t be roofed over, and Connecticut’s joint-tape rule does not apply to narrow board decks.
Of the 21 New London County municipalities on this site, Stonington has the 9th largest share of homes built before 1980: 62%, against a county range of 31% to 83%.
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Storm record around Stonington
Within 10 miles of Stonington, hail of an inch or more was reported on 6 days between 2006 and 2025, the biggest stones 1.75 in on September 3, 2013. The most recent was August 15, 2024.
That is fewer than most places in the state on this site (median 9 days).
Remnants of Hurricane Ida (DR-4629, October 2021) is the latest of 10 federal storm declarations covering New London County since 2006. (OpenFEMA.)
Useful life is HUD’s planning figure, not a warranty. More in the guides to shingles, metal, slate and flat roofs.
Material
HUD useful life
Fits a house like
Watch for
Asphalt shingles
20 years
Most pitched roofs; 71% of homes here are detached
Class G or H at 129 mph design wind (IRC Table R905.2.4.1)
Metal (standing seam, panels)
50 years
Simple roofs with long, unbroken slopes
Standing seam that carries its own loads can skip the tear-off (R908.3.1)
Slate
75 years
Older houses; 31% here predate 1940
Never a base for a new layer (R908.3.1.1); heavy
Flat roof: EPDM or TPO
15 years
Porches, additions, low-slope rears
Coating is not a replacement
Checking a contractor in Connecticut
Whoever quotes a roof in Stonington should give you a Connecticut home improvement registration number (C.G.S. § 20-420); the state’s data portal listed 24,065 active ones in October 2026. Registration is not an endorsement of workmanship (§ 20-427(b)(6)).
Is a permit required for a new roof in Stonington, CT?
The 25 percent line. A whole new roof is more than that, so it goes to Stonington’s building official.
Is a roof-over allowed in Stonington, or is it a tear-off?
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 62% of Stonington’s homes were built before 1980, so count the layers before comparing quotes.
How old are the houses in Stonington?
By the Census Bureau’s American Community Survey (2020–2024), the median home in Stonington was built in 1968, 62% of homes were built before 1980, 73% are owner-occupied.
How many hail days has Stonington had?
Hail of 1 inch or larger was reported on 6 days within 10 miles of Stonington from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
How do I check a roofing contractor in Stonington?
Whoever quotes a roof in Stonington should give you a Connecticut home improvement registration number (C.G.S. § 20-420); the state’s data portal listed 24,065 active ones in October 2026. Registration is not an endorsement of workmanship (§ 20-427(b)(6)).
What they will ask on the phone
The street address in Stonington, or at least the ZIP code
The number of stories, and whether the house stands alone
What covers the roof now and about when it went on
The number of layers, if anyone has counted
Your timing for a complete replacement
Any historic-district or HOA rules on the house in Stonington