Half of the 13,090 homes in Westerly were built before 1973. The rules below decide how much of the old roof has to come off and what goes under the new one.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.
The rules for a reroof in Westerly
Permit
A permit from Westerly
Rhode Island’s list of permit-exempt work names replacement window sashes but not roofing (SBC-2, R105.2). So Westerly’s building official issues a permit for the replacement.
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 59% of Westerly’s homes were built before 1980, so count the layers before comparing quotes.
The state’s climate table marks the ice barrier “yes” statewide. That is a self-adhering membrane, or two cemented layers of underlayment, from the eave to at least 24 inches inside the wall line (IRC R905.1.2).
Owners live in 7,837 of Westerly’s occupied homes, or 75%. Counting by decade, 22% before 1940, 36% before 1960, 59% before 1980 of the housing was in place, and 15% dates from 2000 on. (ACS 2020–2024.)
The housing is 69% detached houses, 3% attached single-family houses (rowhouses, twins and townhouses), 17% buildings of two to four units.
15% of the homes in Westerly are seasonal or occasional-use homes (ACS 2020–2024). If yours is one of them and you live elsewhere, the call still has to come from you as the owner.
Of the 8 Washington County municipalities on this site, Westerly has the largest share of homes built before 1980: 59%, against a county range of 30% to 59%.
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Hail and storms near Westerly
Within 10 miles of Westerly, hail of an inch or more was reported on 4 days between 2006 and 2025, the biggest stones 1.5 in on August 15, 2024.
That is fewer than most places in the state on this site (median 8 days).
At the county level, Westerly shares Washington County’s record of 8 storm disaster declarations since 2006, the newest DR-4766 (Severe Storms and Flooding, March 2024). (OpenFEMA.)
Useful life is HUD’s planning figure, not a warranty. More in the guides to shingles, metal, slate and flat roofs.
Material
HUD useful life
Fits a house like
Watch for
Asphalt shingles
20 years
Most pitched roofs; 69% of homes here are detached
Wind class set by the design wind speed (IRC Table R905.2.4.1)
Metal (standing seam, panels)
50 years
Simple roofs with long, unbroken slopes
A complete standing-seam system may go over the old roof (R908.3.1)
Slate
75 years
Older houses; 22% here predate 1940
Sound slate can be reused (R908.5); broken slate cannot
Flat roof: EPDM or TPO
15 years
Additions and porch roofs
Where the roof meets a wall or parapet
Checking a contractor in Rhode Island
For a reroof in Westerly, ask for the contractor’s Rhode Island registration with the Contractors’ Registration and Licensing Board (ch. 5-65) and look it up; the state has no separate license for residential roofing.
A permit from Westerly. Rhode Island’s list of permit-exempt work names replacement window sashes but not roofing (SBC-2, R105.2). So Westerly’s building official issues a permit for the replacement.
Can a new roof go over the old one in Westerly?
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 59% of Westerly’s homes were built before 1980, so count the layers before comparing quotes.
When were most homes in Westerly built?
By the Census Bureau’s American Community Survey (2020–2024), the median home in Westerly was built in 1973, 59% of homes were built before 1980, 75% are owner-occupied.
How often does hail hit Westerly?
Hail of 1 inch or larger was reported on 4 days within 10 miles of Westerly from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
What license or registration should a roofer in Westerly have?
For a reroof in Westerly, ask for the contractor’s Rhode Island registration with the Contractors’ Registration and Licensing Board (ch. 5-65) and look it up; the state has no separate license for residential roofing.
What they will ask on the phone
The street address in Westerly, or at least the ZIP code
The number of stories, and whether the house stands alone
What is on the roof now (asphalt shingles, metal, slate, tile, or a flat membrane) and roughly how old it is
How many layers are on it, if you know
Your timing for a complete replacement
Whether the house is in a historic district or an HOA