Permit
Expect a building permit
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). The application to Stoneham’s building department carries the contractor’s HIC number (R105.3).
Half of the 10,196 homes in Stoneham were built before 1964. Below: what the code asks of a replacement here, the permit, and the town’s own records.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). The application to Stoneham’s building department carries the contractor’s HIC number (R105.3).
Layers
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 70% of Stoneham’s homes were built before 1980; many have been reroofed before.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
There is no local exception: the state table says “yes.” It runs from the eave to 24 inches inside the exterior wall, more on steep roofs (IRC R905.1.2); check that the quote lists it.
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Stoneham’s code design values are a 119 mph ultimate design wind speed and a 40 psf ground snow load (30 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Checked against the code text on October 24, 2026. Everything else the state requires: roof replacement in Massachusetts.
71% of the occupied homes in Stoneham are lived in by their owners: 6,923 households, the people this line is for. Counting by decade, 25% before 1940, 46% before 1960, 70% before 1980 of the housing was in place, and 12% dates from 2000 on. (ACS 2020–2024.)
The housing is 54% detached houses, 4% attached single-family houses (rowhouses, twins and townhouses), 12% buildings of two to four units.
Of the 54 Middlesex County municipalities on this site, Stoneham has the 17th largest share of homes built before 1980: 70%, against a county range of 29% to 87%.
ZIP codes: 02180
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Stoneham | 1964 | 70% | 71% | 4% | 10 |
| Melrose | 1938 | 84% | 67% | 4% | 11 |
| Wakefield | 1956 | 71% | 71% | 5% | 9 |
| Winchester | 1954 | 78% | 82% | 9% | 10 |
| Woburn | 1968 | 63% | 56% | 9% | 10 |
| Medford | 1942 | 76% | 54% | 7% | 10 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Since 2006 the National Weather Service has logged hail of 1 inch or larger on 10 separate days within 10 miles of Stoneham; the largest was 3 in on July 11, 2006. The most recent was August 23, 2020.
Middlesex County has had 8 federal major-disaster declarations for storms since 2006; the latest was DR-4379, Severe Winter Storm and Snowstorm (July 2018). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
HUD’s useful-life figures are for planning; a warranty is a separate promise. For Stoneham’s houses: More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 54% of homes here are detached | Class G or H at 119 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Low pitches and long runs | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older houses; 25% here predate 1940 | Can’t be roofed over; check the framing for the weight |
| Flat roof: EPDM or TPO | 15 years | Additions and porch roofs | Seams at walls and drainage |
For an owner-occupied home of one to four units in Stoneham, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
Contracts, deposits and the right to cancel: checking a roofing contractor. What moves the price: new roof cost in Massachusetts.
Expect a building permit. Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). The application to Stoneham’s building department carries the contractor’s HIC number (R105.3).
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 70% of Stoneham’s homes were built before 1980; many have been reroofed before.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Stoneham was built in 1964, 70% of homes were built before 1980, 71% are owner-occupied.
Hail of 1 inch or larger was reported on 10 days within 10 miles of Stoneham from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
For an owner-occupied home of one to four units in Stoneham, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.