Permit
Roofing is not exempt
Massachusetts exempts sheds, fences and finish work from permits (R105.2), not roofing. In Medford the building department takes the application, with the contractor’s home improvement registration on it.
The median home in Medford was built in 1942; there are 25,587 of them. What the code requires when that roof is replaced, and who signs off, is below.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Massachusetts exempts sheds, fences and finish work from permits (R105.2), not roofing. In Medford the building department takes the application, with the contractor’s home improvement registration on it.
Layers
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 76% of Medford’s homes were built before 1980, ask what is under the newest layer.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
The state’s climate table marks the ice barrier “yes” statewide. That is a self-adhering membrane, or two cemented layers of underlayment, from the eave to at least 24 inches inside the wall line (IRC R905.1.2).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Medford’s code design values are a 119 mph ultimate design wind speed and a 40 psf ground snow load (30 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Checked against the code text on October 24, 2026. Everything else the state requires: roof replacement in Massachusetts.
Owners live in 13,159 of Medford’s occupied homes, or 54%. Counting by decade, 49% before 1940, 64% before 1960, 76% before 1980 of the housing was in place, and 13% dates from 2000 on. (ACS 2020–2024.)
The housing is 34% detached houses, 7% attached single-family houses (rowhouses, twins and townhouses), 34% buildings of two to four units.
Older houses hide their history: ask the contractor to confirm the deck (board or sheet) and every layer above it before pricing, because slate or two layers mean a full tear-off.
Of the 54 Middlesex County municipalities on this site, Medford has the 9th largest share of homes built before 1980: 76%, against a county range of 29% to 87%.
ZIP codes: 02155
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Medford | 1942 | 76% | 54% | 7% | 10 |
| Somerville | 1938 | 80% | 34% | 4% | 12 |
| Malden | 1950 | 71% | 41% | 7% | 11 |
| Winchester | 1954 | 78% | 82% | 9% | 10 |
| Arlington | 1945 | 86% | 62% | 7% | 9 |
| Everett | 1938 | 77% | 37% | 6% | 12 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Since 2006 the National Weather Service has logged hail of 1 inch or larger on 10 separate days within 10 miles of Medford; the largest was 2 in on August 4, 2015. The most recent was August 23, 2020.
At the county level, Medford shares Middlesex County’s record of 8 storm disaster declarations since 2006, the newest DR-4379 (Severe Winter Storm and Snowstorm, July 2018). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
HUD’s useful-life figures are for planning; a warranty is a separate promise. For Medford’s houses: More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 34% of homes here are detached | Class G or H at 119 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Simple roofs with long, unbroken slopes | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older houses; 49% here predate 1940 | Can’t be roofed over; check the framing for the weight |
| Flat roof: EPDM or TPO | 15 years | Additions and porch roofs | Seams at walls and drainage |
For an owner-occupied home of one to four units in Medford, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
Contracts, deposits and the right to cancel: checking a roofing contractor. What moves the price: new roof cost in Massachusetts.
Roofing is not exempt. Massachusetts exempts sheds, fences and finish work from permits (R105.2), not roofing. In Medford the building department takes the application, with the contractor’s home improvement registration on it.
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 76% of Medford’s homes were built before 1980, ask what is under the newest layer.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Medford was built in 1942, 76% of homes were built before 1980, 54% are owner-occupied.
Hail of 1 inch or larger was reported on 10 days within 10 miles of Medford from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
For an owner-occupied home of one to four units in Medford, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.