Permit
A permit from Shrewsbury
Massachusetts exempts sheds, fences and finish work from permits (R105.2), not roofing. The application to Shrewsbury’s building department carries the contractor’s HIC number (R105.3).
Half of the 15,393 homes in Shrewsbury were built before 1979. What the code requires when that roof is replaced, and who signs off, is below.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Massachusetts exempts sheds, fences and finish work from permits (R105.2), not roofing. The application to Shrewsbury’s building department carries the contractor’s HIC number (R105.3).
Layers
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). With 51% of Shrewsbury’s homes were built before 1980, ask what is under the newest layer.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
There is no local exception: the state table says “yes.” That is a self-adhering membrane, or two cemented layers of underlayment, from the eave to at least 24 inches inside the wall line (IRC R905.1.2).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Shrewsbury’s code design values are a 118 mph ultimate design wind speed and a 50 psf ground snow load (35 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Rules as read on October 24, 2026. Code edition, permit and contract rules for the whole state: roof replacement in Massachusetts.
Owners live in 10,623 of Shrewsbury’s occupied homes, or 72%. By year built, 11% before 1940, 31% before 1960, 51% before 1980; 15% went up in 2000 or later. (ACS 2020–2024.)
By building type: 65% detached houses, 8% attached single-family houses (rowhouses, twins and townhouses), 6% buildings of two to four units.
Of the 59 Worcester County municipalities on this site, Shrewsbury has the 41st largest share of homes built before 1980: 51%, against a county range of 35% to 79%.
ZIP codes: 01545
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Shrewsbury | 1979 | 51% | 72% | 8% | 18 |
| Northborough | 1980 | 49% | 83% | 8% | 18 |
| Boylston | 1977 | 56% | 79% | 8% | 17 |
| Worcester | 1951 | 75% | 43% | 6% | 19 |
| Westborough | 1976 | 57% | 62% | 7% | 18 |
| Grafton | 1977 | 54% | 73% | 15% | 19 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Within 10 miles of Shrewsbury, hail of an inch or more was reported on 18 days between 2006 and 2025, the biggest stones 2 in on June 1, 2011. The most recent was July 17, 2021.
That is more hail days than 95% of the places in the state on this site.
Federal major-disaster declarations for storms in Worcester County since 2006: 7, most recently DR-4379, Severe Winter Storm and Snowstorm, declared July 2018. (OpenFEMA.)
A report says hail fell near Shrewsbury, not that it damaged a roof. When wind or hail damage means a new roof.
Useful life is HUD’s planning figure, not a warranty. More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 65% of homes here are detached | Class G or H at 118 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Roofs that will carry solar later | Standing seam that carries its own loads can skip the tear-off (R908.3.1) |
| Slate | 75 years | Older houses; 11% here predate 1940 | Sound slate can be reused (R908.5); broken slate cannot |
| Flat roof: EPDM or TPO | 15 years | Porches, additions, low-slope rears | Seams at walls and drainage |
In Shrewsbury the contractor’s HIC registration (M.G.L. c. 142A) and the CSL of the supervisor licensed for roof covering are the two numbers to look up before signing.
The price side is in what a new roof costs in Massachusetts; the paperwork side in checking a roofing contractor.
A permit from Shrewsbury. Massachusetts exempts sheds, fences and finish work from permits (R105.2), not roofing. The application to Shrewsbury’s building department carries the contractor’s HIC number (R105.3).
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). With 51% of Shrewsbury’s homes were built before 1980, ask what is under the newest layer.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Shrewsbury was built in 1979, 51% of homes were built before 1980, 72% are owner-occupied.
Hail of 1 inch or larger was reported on 18 days within 10 miles of Shrewsbury from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
In Shrewsbury the contractor’s HIC registration (M.G.L. c. 142A) and the CSL of the supervisor licensed for roof covering are the two numbers to look up before signing.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.