Permit
A permit is needed
Florida’s code exempts no building work from permits (FBC Building § 105.2); in Palm River-Clair Mel the reroof permit comes from Hillsborough County’s building department.
Half of the 16,050 homes in Palm River-Clair Mel were built before 1995. 54% predate 2000, and Florida’s reroof rules depend on when the house was permitted.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Florida’s code exempts no building work from permits (FBC Building § 105.2); in Palm River-Clair Mel the reroof permit comes from Hillsborough County’s building department.
Layers
A tear-off to the deck is required where the roof already has two layers, where the covering is tile, slate or wood shake, or where it is water-soaked or deteriorated (FBC Existing Building 706.3).
The 25 percent rule
Florida limits partial work: if more than 25 percent of a roof or roof section is redone in 12 months, the whole roof or section has to meet the current code. Roofs built or replaced under the 2007 Florida Building Code or later are exempt; only the new part must meet the code in effect (FBC Existing Building 706.1.1; Fla. Stat. § 553.844(5)).
Source: FBC Existing Building, 8th ed. (2023), Chapter 7; Fla. Stat. § 553.844
Houses permitted before 2002
If your site-built single-family home was permitted before the Florida Building Code took effect (March 1, 2002), a full roof replacement must include a secondary water barrier and re-nailing of the roof deck: at least two 8d nails per rafter, a nail counting as 8d if it is at least 0.113 inch thick and 2¼ inches long (Fla. Stat. § 553.844(3); FBC Existing Building 706.7).
54% of homes in Palm River-Clair Mel were built before 2000 (ACS); the year the house was permitted is what counts.
Source: Fla. Stat. § 553.844; FBC Existing Building, 8th ed. (2023), Chapter 7
Checked against the code text on October 24, 2026. Everything else the state requires: roof replacement in Florida.
Owners live in 7,626 of Palm River-Clair Mel’s occupied homes, or 51%. Counting by decade, 14% before 1960, 38% before 1980, 54% before 2000 of the housing was in place, and 46% dates from 2000 on. (ACS 2020–2024.)
The housing is 54% detached houses, 6% attached single-family houses (rowhouses, twins and townhouses), 6% manufactured homes.
Of the 33 Hillsborough County places on this site, Palm River-Clair Mel has the 20th largest share of homes built before 2000: 54%, against a county range of 17% to 95%.
ZIP codes: 33619
| Place | Median built | Before 2000 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Palm River-Clair Mel | 1995 | 54% | 51% | 6% | 10 |
| Progress Village | 2011 | 17% | 65% | 32% | 5 |
| Brandon | 1989 | 73% | 58% | 8% | 10 |
| East Lake-Orient Park | 1982 | 74% | 52% | 8% | 15 |
| Mango | — | — | — | — | 12 |
| Gibsonton | 2004 | 38% | 66% | 5% | 4 |
Median built: median year the homes were built. Before 2000: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Within 10 miles of Palm River-Clair Mel, hail of an inch or more was reported on 10 days between 2006 and 2025, the biggest stones 1.75 in on July 6, 2008. The most recent was June 2, 2025.
At the county level, Palm River-Clair Mel shares Hillsborough County’s record of 9 storm disaster declarations since 2006, the newest DR-4834 (Hurricane Milton, October 2024). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
Lifespans come from HUD’s capital-needs table, not from a brochure. More in the guides to shingles, metal, slate, tile and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 54% of homes here are detached | Wind class set by the design wind speed (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Roofs that will carry solar later | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older and historic houses | Can’t be roofed over; check the framing for the weight |
| Clay or concrete tile | 60 years | Houses framed for tile | Can’t be roofed over (FBC-EB 706.3) |
| Flat roof: EPDM or TPO | 15 years | Additions and porch roofs | Where the roof meets a wall or parapet |
Ask anyone quoting a roof in Palm River-Clair Mel for a Florida license number, Certified Roofing Contractor (CCC, statewide) or Registered Roofing Contractor (RC, local), and check it on DBPR; 9,419 CCC licenses were active on October 23, 2026.
Contracts, deposits and the right to cancel: Florida roofing licenses. What moves the price: new roof cost in Florida.
A permit is needed. Florida’s code exempts no building work from permits (FBC Building § 105.2); in Palm River-Clair Mel the reroof permit comes from Hillsborough County’s building department.
A tear-off to the deck is required where the roof already has two layers, where the covering is tile, slate or wood shake, or where it is water-soaked or deteriorated (FBC Existing Building 706.3).
By the Census Bureau’s American Community Survey (2020–2024), the median home in Palm River-Clair Mel was built in 1995, 54% of homes were built before 2000, 51% are owner-occupied.
Hail of 1 inch or larger was reported on 10 days within 10 miles of Palm River-Clair Mel from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
Ask anyone quoting a roof in Palm River-Clair Mel for a Florida license number, Certified Roofing Contractor (CCC, statewide) or Registered Roofing Contractor (RC, local), and check it on DBPR; 9,419 CCC licenses were active on October 23, 2026.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.