This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.
The rules for a reroof in Thompson
Permit
A permit from Thompson
Without a permit, Connecticut allows only:
Repairs that are limited to 25 percent of roof covering and building siding within one calendar year.
2022 CSBC, (Amd) R105.2, item 11
A whole new roof is more than that, so it goes to Thompson’s building official.
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). With 70% of Thompson’s homes were built before 1980, ask what is under the newest layer.
Connecticut answers “yes” to the ice barrier for every town. That is a self-adhering membrane, or two cemented layers of underlayment, from the eave to at least 24 inches inside the wall line (IRC R905.1.2).
Connecticut adds a 4-inch self-adhering strip over all joints of a plywood or OSB deck ((Amd) R905.1.1). It is not needed under a fully adhered membrane, or on board decks under 3 feet wide, which matters in a town where 33% of homes predate 1940.
Thompson’s code design values are a 120 mph ultimate design wind speed and a 40 psf ground snow load. At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
84% of the occupied homes in Thompson are lived in by their owners: 3,482 households, the people this line is for. Counting by decade, 33% before 1940, 47% before 1960, 70% before 1980 of the housing was in place, and 11% dates from 2000 on. (ACS 2020–2024.)
The housing is 77% detached houses, 6% attached single-family houses (rowhouses, twins and townhouses), 11% buildings of two to four units, 3% manufactured homes.
Older houses hide their history: ask the contractor to confirm the deck (board or sheet) and every layer above it before pricing, because slate or two layers mean a full tear-off, and a board deck changes Connecticut’s joint-tape line.
Of the 15 Windham County municipalities on this site, Thompson has the 3rd largest share of homes built before 1980: 70%, against a county range of 38% to 81%.
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Hail and storms near Thompson
Since 2006 the National Weather Service has logged hail of 1 inch or larger on 7 separate days within 10 miles of Thompson; the largest was 1.75 in on May 8, 2024.
That is fewer than most places in the state on this site (median 9 days).
Windham County has had 8 federal major-disaster declarations for storms since 2006; the latest was DR-4580, Tropical Storm Isaias (January 2021). (OpenFEMA.)
HUD’s useful-life figures are for planning; a warranty is a separate promise. For Thompson’s houses: More in the guides to shingles, metal, slate and flat roofs.
Material
HUD useful life
Fits a house like
Watch for
Asphalt shingles
20 years
Most pitched roofs; 77% of homes here are detached
Class G or H at 120 mph design wind (IRC Table R905.2.4.1)
Metal (standing seam, panels)
50 years
Roofs that will carry solar later
A complete standing-seam system may go over the old roof (R908.3.1)
Slate
75 years
Older houses; 33% here predate 1940
Sound slate can be reused (R908.5); broken slate cannot
Flat roof: EPDM or TPO
15 years
Additions and porch roofs
Coating is not a replacement
Checking a contractor in Connecticut
Connecticut registers home improvement contractors and their salespeople with the Department of Consumer Protection (C.G.S. § 20-420); 24,065 contractor registrations were active in October 2026. Ask for the number of anyone pricing a roof in Thompson.
A permit from Thompson. A whole new roof is more than that, so it goes to Thompson’s building official.
Is a roof-over allowed in Thompson, or is it a tear-off?
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). With 70% of Thompson’s homes were built before 1980, ask what is under the newest layer.
When were most homes in Thompson built?
By the Census Bureau’s American Community Survey (2020–2024), the median home in Thompson was built in 1963, 70% of homes were built before 1980, 84% are owner-occupied.
How often does hail hit Thompson?
Hail of 1 inch or larger was reported on 7 days within 10 miles of Thompson from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
What license or registration should a roofer in Thompson have?
Connecticut registers home improvement contractors and their salespeople with the Department of Consumer Protection (C.G.S. § 20-420); 24,065 contractor registrations were active in October 2026. Ask for the number of anyone pricing a roof in Thompson.
What they will ask on the phone
The street address in Thompson, or at least the ZIP code
How many stories the house has, and whether it is detached or attached
What covers the roof now and about when it went on
How many layers are on it, if you know
Your timing for a complete replacement
Whether the house is in a historic district or an HOA