Clinton has 6,422 homes, and half of them were standing by 1968. Below: what the code asks of a replacement here, the permit, and the town’s own records.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.
The rules for a reroof in Clinton
Permit
A permit from Clinton
Without a permit, Connecticut allows only:
Repairs that are limited to 25 percent of roof covering and building siding within one calendar year.
2022 CSBC, (Amd) R105.2, item 11
A whole new roof is more than that, so it goes to Clinton’s building official.
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). 66% of Clinton’s homes were built before 1980; many have been reroofed before.
Connecticut answers “yes” to the ice barrier for every town. It runs from the eave to 24 inches inside the exterior wall, more on steep roofs (IRC R905.1.2); check that the quote lists it.
Connecticut adds a 4-inch self-adhering strip over all joints of a plywood or OSB deck ((Amd) R905.1.1). It is not needed under a fully adhered membrane, or on board decks under 3 feet wide.
Clinton’s code design values are a 125 mph ultimate design wind speed and a 30 psf ground snow load; it is in Connecticut’s hurricane-prone region. At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
85% of the occupied homes in Clinton are lived in by their owners: 4,668 households, the people this line is for. By year built, 16% before 1940, 30% before 1960, 66% before 1980; 10% went up in 2000 or later. (ACS 2020–2024.)
By building type: 79% detached houses, 4% attached single-family houses (rowhouses, twins and townhouses), 8% buildings of two to four units, 3% manufactured homes.
Of the 15 Middlesex County municipalities on this site, Clinton has the 6th largest share of homes built before 1980: 66%, against a county range of 41% to 71%.
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Storm record around Clinton
Within 10 miles of Clinton, hail of an inch or more was reported on 3 days between 2006 and 2025, the biggest stones 2 in on July 1, 2012. The most recent was August 26, 2024.
That is fewer than most places in the state on this site (median 9 days).
Remnants of Hurricane Ida (DR-4629, October 2021) is the latest of 9 federal storm declarations covering Middlesex County since 2006. (OpenFEMA.)
Lifespans come from HUD’s capital-needs table, not from a brochure. More in the guides to shingles, metal, slate and flat roofs.
Material
HUD useful life
Fits a house like
Watch for
Asphalt shingles
20 years
Most pitched roofs; 79% of homes here are detached
Class G or H at 125 mph design wind (IRC Table R905.2.4.1)
Metal (standing seam, panels)
50 years
Simple roofs with long, unbroken slopes
Standing seam that carries its own loads can skip the tear-off (R908.3.1)
Slate
75 years
Older houses; 16% here predate 1940
Can’t be roofed over; check the framing for the weight
Flat roof: EPDM or TPO
15 years
Porches, additions, low-slope rears
Seams at walls and drainage
Checking a contractor in Connecticut
Connecticut registers home improvement contractors and their salespeople with the Department of Consumer Protection (C.G.S. § 20-420); 24,065 contractor registrations were active in October 2026. Ask for the number of anyone pricing a roof in Clinton.
Is a permit required for a new roof in Clinton, CT?
A permit from Clinton. A whole new roof is more than that, so it goes to Clinton’s building official.
Is a roof-over allowed in Clinton, or is it a tear-off?
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). 66% of Clinton’s homes were built before 1980; many have been reroofed before.
How old are the houses in Clinton?
By the Census Bureau’s American Community Survey (2020–2024), the median home in Clinton was built in 1968, 66% of homes were built before 1980, 85% are owner-occupied.
How many hail days has Clinton had?
Hail of 1 inch or larger was reported on 3 days within 10 miles of Clinton from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
How do I check a roofing contractor in Clinton?
Connecticut registers home improvement contractors and their salespeople with the Department of Consumer Protection (C.G.S. § 20-420); 24,065 contractor registrations were active in October 2026. Ask for the number of anyone pricing a roof in Clinton.
What they will ask on the phone
Your address or ZIP code in Clinton
How many stories the house has, and whether it is detached or attached
The roof you have today, shingle, metal, slate, tile or flat, and its rough age
How many layers are on it, if you know
That the job is a full replacement or a new roof, and your timing
Any historic-district or HOA rules on the house in Clinton