Whitehall has 12,069 homes, and half of them were standing by 1967. The rules below decide how much of the old roof has to come off and what goes under the new one.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.
The rules for a reroof in Whitehall
Permit
Ask Whitehall first
The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). Whether Whitehall wants a permit is in its own ordinance; ask the township code office before the old roof comes off.
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). 70% of Whitehall’s homes were built before 1980, so count the layers before comparing quotes.
Whether an eave membrane is a code item depends on the climate table the municipality filled in when it adopted the code (IRC R905.1.2, Table R301.2). Whitehall’s answer is with the township code office.
62% of the occupied homes in Whitehall are lived in by their owners: 7,282 households, the people this line is for. By year built, 16% before 1940, 35% before 1960, 70% before 1980; 12% went up in 2000 or later. (ACS 2020–2024.)
By building type: 50% detached houses, 19% attached single-family houses (rowhouses, twins and townhouses), 7% buildings of two to four units.
Of the 25 Lehigh County municipalities on this site, Whitehall has the 11th largest share of homes built before 1980: 70%, against a county range of 22% to 90%.
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Storm record around Whitehall
Since 2006 the National Weather Service has logged hail of 1 inch or larger on 24 separate days within 10 miles of Whitehall; the largest was 2.5 in on May 14, 2010. The most recent was July 3, 2025.
That is more hail days than 99% of the places in the state on this site.
Federal major-disaster declarations for storms in Lehigh County since 2006: 2, most recently DR-4267, Severe Winter Storm and Snowstorm, declared March 2016. (OpenFEMA.)
HUD’s useful-life figures are for planning; a warranty is a separate promise. For Whitehall’s houses: More in the guides to shingles, metal, slate and flat roofs.
Material
HUD useful life
Fits a house like
Watch for
Asphalt shingles
20 years
Most pitched roofs; 50% of homes here are detached
Wind class set by the design wind speed (IRC Table R905.2.4.1)
Metal (standing seam, panels)
50 years
Simple roofs with long, unbroken slopes
Standing seam that carries its own loads can skip the tear-off (R908.3.1)
Slate
75 years
Older houses; 16% here predate 1940
Can’t be roofed over; check the framing for the weight
Flat roof: EPDM or TPO
15 years
Low-slope roofs and rear sections (19% of homes here are attached)
Where the roof meets a wall or parapet
Checking a contractor in Pennsylvania
Pennsylvania’s home improvement law (HICPA § 3, § 6) requires registration with the Attorney General from $5,000 a year of such work and puts the number on every estimate; ask for it in Whitehall and look it up.
Does a roof replacement in Whitehall need a permit?
Ask Whitehall first. The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). Whether Whitehall wants a permit is in its own ordinance; ask the township code office before the old roof comes off.
Is a roof-over allowed in Whitehall, or is it a tear-off?
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). 70% of Whitehall’s homes were built before 1980, so count the layers before comparing quotes.
How old are the houses in Whitehall?
By the Census Bureau’s American Community Survey (2020–2024), the median home in Whitehall was built in 1967, 70% of homes were built before 1980, 62% are owner-occupied.
How many hail days has Whitehall had?
Hail of 1 inch or larger was reported on 24 days within 10 miles of Whitehall from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
How do I check a roofing contractor in Whitehall?
Pennsylvania’s home improvement law (HICPA § 3, § 6) requires registration with the Attorney General from $5,000 a year of such work and puts the number on every estimate; ask for it in Whitehall and look it up.
What they will ask on the phone
The street address in Whitehall, or at least the ZIP code
One story or two (or more), detached or attached
What is on the roof now (asphalt shingles, metal, slate, tile, or a flat membrane) and roughly how old it is
The number of layers, if anyone has counted
Your timing for a complete replacement
Any historic-district or HOA rules on the house in Whitehall