Permit
Ask Marietta first
The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). So the borough code office in Marietta is the one to ask before work starts.
Source: 34 Pa. Code § 403.1(b)
Half of the 1,446 homes in Marietta were built before 1938. The rules below decide how much of the old roof has to come off and what goes under the new one.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). So the borough code office in Marietta is the one to ask before work starts.
Source: 34 Pa. Code § 403.1(b)
Layers
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 82% of Marietta’s homes were built before 1980, so count the layers before comparing quotes.
Ice barrier
Whether an eave membrane is a code item depends on the climate table the municipality filled in when it adopted the code (IRC R905.1.2, Table R301.2). The contractor or the borough code office in Marietta will know.
Checked against the code text on October 24, 2026. Code edition, permit and contract rules for the whole state: roof replacement in Pennsylvania.
Of 1,406 occupied homes in Marietta, 867 (62%) are owner-occupied. Counting by decade, 66% before 1940, 76% before 1960, 82% before 1980 of the housing was in place, and 14% dates from 2000 on. (ACS 2020–2024.)
The housing is 30% detached houses, 36% attached single-family houses (rowhouses, twins and townhouses), 11% buildings of two to four units, 4% manufactured homes.
With 36% of homes attached, many roofs here meet a neighbor’s roof at a party wall. Say so on the call, and ask the contractor how the new roof will be tied in where it meets the house next door.
Older houses hide their history: ask the contractor to confirm the deck (board or sheet) and every layer above it before pricing, because slate or two layers mean a full tear-off.
Of the 59 Lancaster County municipalities on this site, Marietta has the 4th largest share of homes built before 1980: 82%, against a county range of 27% to 87%.
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Marietta | 1938 | 82% | 62% | 36% | 17 |
| East Donegal | 1994 | 31% | 77% | 24% | 16 |
| Wrightsville | 1944 | 86% | 68% | 23% | 19 |
| Hellam | 1977 | 56% | 91% | 8% | 19 |
| Columbia | 1938 | 85% | 53% | 31% | 17 |
| West Hempfield | 1985 | 36% | 86% | 13% | 22 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
NOAA’s storm reports show 17 days since 2006 with hail of at least 1 inch inside a 10-mile circle around Marietta, topping out at 2 in on May 14, 2010. The most recent was June 28, 2025.
That is more hail days than 79% of the places in the state on this site.
At the county level, Marietta shares Lancaster County’s record of 3 storm disaster declarations since 2006, the newest DR-4267 (Severe Winter Storm and Snowstorm, March 2016). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
Lifespans come from HUD’s capital-needs table, not from a brochure. More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 30% of homes here are detached | Wind class set by the design wind speed (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Roofs that will carry solar later | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older houses; 66% here predate 1940 | Never a base for a new layer (R908.3.1.1); heavy |
| Flat roof: EPDM or TPO | 15 years | Low-slope roofs and rear sections (36% of homes here are attached) | Coating is not a replacement |
Before signing for a roof in Marietta, get the contractor’s PA registration number: the home improvement law requires registration with the Attorney General above $5,000 a year of such work, and the number on contracts and estimates (HICPA § 3, § 6).
Contracts, deposits and the right to cancel: checking a roofing contractor. What moves the price: new roof cost in Pennsylvania.
Ask Marietta first. The state code does not cover a reroof that changes no structure (34 Pa. Code § 403.1(b)(8)). So the borough code office in Marietta is the one to ask before work starts.
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 82% of Marietta’s homes were built before 1980, so count the layers before comparing quotes.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Marietta was built in 1938, 82% of homes were built before 1980, 62% are owner-occupied.
Hail of 1 inch or larger was reported on 17 days within 10 miles of Marietta from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
Before signing for a roof in Marietta, get the contractor’s PA registration number: the home improvement law requires registration with the Attorney General above $5,000 a year of such work, and the number on contracts and estimates (HICPA § 3, § 6).
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.