Permit
A permit from Wellesley
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Wellesley’s building department issues it, and the application carries the contractor’s HIC registration number.
Half of the 9,400 homes in Wellesley were built before 1955. The rules below decide how much of the old roof has to come off and what goes under the new one.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Wellesley’s building department issues it, and the application carries the contractor’s HIC registration number.
Layers
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 72% of Wellesley’s homes were built before 1980, so count the layers before comparing quotes.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
The state’s climate table marks the ice barrier “yes” statewide. That is a self-adhering membrane, or two cemented layers of underlayment, from the eave to at least 24 inches inside the wall line (IRC R905.1.2).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Wellesley’s code design values are a 119 mph ultimate design wind speed and a 40 psf ground snow load (35 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Rules as read on October 24, 2026. The state’s code edition and the rest of its rules: roof replacement in Massachusetts.
84% of the occupied homes in Wellesley are lived in by their owners: 7,742 households, the people this line is for. By year built, 34% before 1940, 57% before 1960, 72% before 1980; 19% went up in 2000 or later. (ACS 2020–2024.)
By building type: 82% detached houses.
On a house built before 1940, ask what the deck is (boards or plywood) and whether slate sits under the later layers: slate can’t be roofed over.
Of the 28 Norfolk County municipalities on this site, Wellesley has the 7th largest share of homes built before 1980: 72%, against a county range of 41% to 86%.
ZIP codes: 02457 · 02481 · 02482
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Wellesley | 1955 | 72% | 84% | 3% | 9 |
| Needham | 1965 | 64% | 83% | 5% | 10 |
| Natick | 1968 | 61% | 68% | 4% | 8 |
| Weston | 1964 | 65% | 88% | 2% | 8 |
| Newton | 1942 | 80% | 70% | 8% | 9 |
| Dover | 1970 | 61% | 98% | 2% | 9 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Since 2006 the National Weather Service has logged hail of 1 inch or larger on 9 separate days within 10 miles of Wellesley; the largest was 2 in on August 4, 2015. The most recent was August 15, 2024.
Severe Winter Storm and Snowstorm (DR-4651, April 2022) is the latest of 8 federal storm declarations covering Norfolk County since 2006. (OpenFEMA.)
A report says hail fell near Wellesley, not that it damaged a roof. When wind or hail damage means a new roof.
Lifespans come from HUD’s capital-needs table, not from a brochure. More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 82% of homes here are detached | Class G or H at 119 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Simple roofs with long, unbroken slopes | Standing seam that carries its own loads can skip the tear-off (R908.3.1) |
| Slate | 75 years | Older houses; 34% here predate 1940 | Can’t be roofed over; check the framing for the weight |
| Flat roof: EPDM or TPO | 15 years | Porches, additions, low-slope rears | Seams at walls and drainage |
Two numbers to ask for in Wellesley: the HIC registration (M.G.L. c. 142A, for owner-occupied homes of one to four units) and the construction supervisor license (CSL) with the roof covering specialty.
The price side is in what a new roof costs in Massachusetts; the paperwork side in checking a roofing contractor.
A permit from Wellesley. Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Wellesley’s building department issues it, and the application carries the contractor’s HIC registration number.
A new roof may go over one existing layer; with two or more, or over slate, clay or cement tile, everything comes off to the deck (IRC R908.3.1.1). 72% of Wellesley’s homes were built before 1980, so count the layers before comparing quotes.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Wellesley was built in 1955, 72% of homes were built before 1980, 84% are owner-occupied.
Hail of 1 inch or larger was reported on 9 days within 10 miles of Wellesley from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
Two numbers to ask for in Wellesley: the HIC registration (M.G.L. c. 142A, for owner-occupied homes of one to four units) and the construction supervisor license (CSL) with the roof covering specialty.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.