Permit
Expect a building permit
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Middleton’s building department issues it, and the application carries the contractor’s HIC registration number.
The median home in Middleton was built in 1986; there are 3,300 of them. What the code requires when that roof is replaced, and who signs off, is below.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Middleton’s building department issues it, and the application carries the contractor’s HIC registration number.
Layers
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 41% of Middleton’s homes were built before 1980, ask what is under the newest layer.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
There is no local exception: the state table says “yes.” Membrane or doubled underlayment, eave to 24 inches inside the wall line (IRC R905.1.2), is a line on every quote here.
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Middleton’s code design values are a 118 mph ultimate design wind speed and a 50 psf ground snow load (30 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Rules as read on October 24, 2026. Everything else the state requires: roof replacement in Massachusetts.
Owners live in 2,942 of Middleton’s occupied homes, or 93%. By year built, 14% before 1940, 24% before 1960, 41% before 1980; 27% went up in 2000 or later. (ACS 2020–2024.)
By building type: 75% detached houses, 10% attached single-family houses (rowhouses, twins and townhouses), 6% buildings of two to four units.
Of the 34 Essex County municipalities on this site, Middleton has the smallest share of homes built before 1980: 41%, against a county range of 41% to 89%.
ZIP codes: 01949
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Middleton | 1986 | 41% | 93% | 10% | 10 |
| Danvers | 1963 | 70% | 69% | 6% | 7 |
| Topsfield | 1969 | 69% | 90% | 6% | 7 |
| North Reading | 1975 | 57% | 84% | 6% | 13 |
| Boxford | 1979 | 51% | 95% | 4% | 9 |
| Lynnfield | 1964 | 73% | 87% | 5% | 10 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Since 2006 the National Weather Service has logged hail of 1 inch or larger on 10 separate days within 10 miles of Middleton; the largest was 3 in on July 11, 2006. The most recent was September 8, 2023.
Severe Winter Storm and Snowstorm (DR-4379, July 2018) is the latest of 9 federal storm declarations covering Essex County since 2006. (OpenFEMA.)
A report says hail fell near Middleton, not that it damaged a roof. When wind or hail damage means a new roof.
Lifespans come from HUD’s capital-needs table, not from a brochure. More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 75% of homes here are detached | Class G or H at 118 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Simple roofs with long, unbroken slopes | Standing seam that carries its own loads can skip the tear-off (R908.3.1) |
| Slate | 75 years | Older houses; 14% here predate 1940 | Can’t be roofed over; check the framing for the weight |
| Flat roof: EPDM or TPO | 15 years | Porches, additions, low-slope rears | Coating is not a replacement |
In Middleton the contractor’s HIC registration (M.G.L. c. 142A) and the CSL of the supervisor licensed for roof covering are the two numbers to look up before signing.
The price side is in what a new roof costs in Massachusetts; the paperwork side in checking a roofing contractor.
Expect a building permit. Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Middleton’s building department issues it, and the application carries the contractor’s HIC registration number.
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 41% of Middleton’s homes were built before 1980, ask what is under the newest layer.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Middleton was built in 1986, 41% of homes were built before 1980, 93% are owner-occupied.
Hail of 1 inch or larger was reported on 10 days within 10 miles of Middleton from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
In Middleton the contractor’s HIC registration (M.G.L. c. 142A) and the CSL of the supervisor licensed for roof covering are the two numbers to look up before signing.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.