Permit
A permit from Longmeadow
The residential code’s permit-exempt list (R105.2) has no roofing line. The application to Longmeadow’s building department carries the contractor’s HIC number (R105.3).
The median home in Longmeadow was built in 1957; there are 5,805 of them. What the code requires when that roof is replaced, and who signs off, is below.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
The residential code’s permit-exempt list (R105.2) has no roofing line. The application to Longmeadow’s building department carries the contractor’s HIC number (R105.3).
Layers
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 86% of Longmeadow’s homes were built before 1980, ask what is under the newest layer.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
There is no local exception: the state table says “yes.” Membrane or doubled underlayment, eave to 24 inches inside the wall line (IRC R905.1.2), is a line on every quote here.
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Longmeadow’s code design values are a 116 mph ultimate design wind speed and a 35 psf ground snow load (35 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class D, G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Checked against the code text on October 24, 2026. Code edition, permit and contract rules for the whole state: roof replacement in Massachusetts.
Of 5,626 occupied homes in Longmeadow, 5,069 (90%) are owner-occupied. Counting by decade, 30% before 1940, 57% before 1960, 86% before 1980 of the housing was in place, and 2% dates from 2000 on. (ACS 2020–2024.)
The housing is 89% detached houses, 4% attached single-family houses (rowhouses, twins and townhouses).
Older houses hide their history: ask the contractor to confirm the deck (board or sheet) and every layer above it before pricing, because slate or two layers mean a full tear-off.
Of the 21 Hampden County municipalities on this site, Longmeadow has the largest share of homes built before 1980: 86%, against a county range of 37% to 86%.
ZIP codes: 01106
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Longmeadow | 1957 | 86% | 90% | 4% | 18 |
| East Longmeadow | 1966 | 62% | 87% | 2% | 17 |
| Agawam | 1970 | 76% | 74% | 5% | 19 |
| Springfield | 1952 | 83% | 50% | 5% | 14 |
| West Springfield | 1958 | 74% | 59% | 4% | 18 |
| Hampden | 1966 | 72% | 95% | 3% | 15 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Within 10 miles of Longmeadow, hail of an inch or more was reported on 18 days between 2006 and 2025, the biggest stones 3 in on July 26, 2011. The most recent was August 15, 2024.
That is more hail days than 95% of the places in the state on this site.
At the county level, Longmeadow shares Hampden County’s record of 7 storm disaster declarations since 2006, the newest DR-4110 (Severe Winter Storm, Snowstorm, and Flooding, April 2013). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
Lifespans come from HUD’s capital-needs table, not from a brochure. More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 89% of homes here are detached | Class D, G or H at 116 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Simple roofs with long, unbroken slopes | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older houses; 30% here predate 1940 | Never a base for a new layer (R908.3.1.1); heavy |
| Flat roof: EPDM or TPO | 15 years | Additions and porch roofs | Seams at walls and drainage |
For an owner-occupied home of one to four units in Longmeadow, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
Contracts, deposits and the right to cancel: checking a roofing contractor. What moves the price: new roof cost in Massachusetts.
A permit from Longmeadow. The residential code’s permit-exempt list (R105.2) has no roofing line. The application to Longmeadow’s building department carries the contractor’s HIC number (R105.3).
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 86% of Longmeadow’s homes were built before 1980, ask what is under the newest layer.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Longmeadow was built in 1957, 86% of homes were built before 1980, 90% are owner-occupied.
Hail of 1 inch or larger was reported on 18 days within 10 miles of Longmeadow from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
For an owner-occupied home of one to four units in Longmeadow, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.