Permit
Roofing is not exempt
The residential code’s permit-exempt list (R105.2) has no roofing line. The application to Halifax’s building department carries the contractor’s HIC number (R105.3).
The median home in Halifax was built in 1979; there are 3,102 of them. What the code requires when that roof is replaced, and who signs off, is below.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
The residential code’s permit-exempt list (R105.2) has no roofing line. The application to Halifax’s building department carries the contractor’s HIC number (R105.3).
Layers
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 53% of Halifax’s homes were built before 1980, ask what is under the newest layer.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
There is no local exception: the state table says “yes.” Membrane or doubled underlayment, eave to 24 inches inside the wall line (IRC R905.1.2), is a line on every quote here.
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Halifax’s code design values are a 125 mph ultimate design wind speed and a 30 psf ground snow load (30 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Checked against the code text on October 24, 2026. The state’s code edition and the rest of its rules: roof replacement in Massachusetts.
96% of the occupied homes in Halifax are lived in by their owners: 2,823 households, the people this line is for. Counting by decade, 13% before 1940, 19% before 1960, 53% before 1980 of the housing was in place, and 16% dates from 2000 on. (ACS 2020–2024.)
The housing is 73% detached houses, 8% attached single-family houses (rowhouses, twins and townhouses), 15% manufactured homes.
Of the 27 Plymouth County municipalities on this site, Halifax has the 18th largest share of homes built before 1980: 53%, against a county range of 42% to 81%.
ZIP codes: 02338
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Halifax | 1979 | 53% | 96% | 8% | 8 |
| Hanson | 1972 | 61% | 89% | 7% | 8 |
| Plympton | 1981 | 48% | 93% | 1% | 7 |
| East Bridgewater | 1977 | 54% | 83% | 3% | 11 |
| Pembroke | 1974 | 59% | 90% | 6% | 8 |
| Bridgewater | 1984 | 45% | 76% | 8% | 9 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
NOAA’s storm reports show 8 days since 2006 with hail of at least 1 inch inside a 10-mile circle around Halifax, topping out at 1.75 in on August 22, 2020. The most recent was July 14, 2022.
That is fewer than most places in the state on this site (median 10 days).
At the county level, Halifax shares Plymouth County’s record of 8 storm disaster declarations since 2006, the newest DR-4651 (Severe Winter Storm and Snowstorm, April 2022). (OpenFEMA.)
Storm reports are what observers logged, not a measure of damage to any roof. When wind or hail damage means a new roof.
Useful life is HUD’s planning figure, not a warranty. More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 73% of homes here are detached | Class G or H at 125 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Simple roofs with long, unbroken slopes | A complete standing-seam system may go over the old roof (R908.3.1) |
| Slate | 75 years | Older houses; 13% here predate 1940 | Never a base for a new layer (R908.3.1.1); heavy |
| Flat roof: EPDM or TPO | 15 years | Additions and porch roofs | Seams at walls and drainage |
For an owner-occupied home of one to four units in Halifax, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
Contracts, deposits and the right to cancel: checking a roofing contractor. What moves the price: new roof cost in Massachusetts.
Roofing is not exempt. The residential code’s permit-exempt list (R105.2) has no roofing line. The application to Halifax’s building department carries the contractor’s HIC number (R105.3).
IRC R908.3.1.1 forbids roofing over two existing layers, over slate or tile, or over a water-soaked roof. With 53% of Halifax’s homes were built before 1980, ask what is under the newest layer.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Halifax was built in 1979, 53% of homes were built before 1980, 96% are owner-occupied.
Hail of 1 inch or larger was reported on 8 days within 10 miles of Halifax from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
For an owner-occupied home of one to four units in Halifax, the contractor must be registered under the home improvement law (M.G.L. c. 142A), and a construction supervisor licensed (CSL) for roof covering supervises a permitted reroof. Ask for both numbers.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.