Permit
A permit from Fall River
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Fall River’s building department issues it, and the application carries the contractor’s HIC registration number.
Fall River has 44,576 homes, and half of them were standing by 1945. Below: what the code asks of a replacement here, the permit, and the town’s own records.
New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.
This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Permit
Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Fall River’s building department issues it, and the application carries the contractor’s HIC registration number.
Layers
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). 78% of Fall River’s homes were built before 1980; many have been reroofed before.
Source: IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes); 780 CMR 51.00, Chapter 9 amendments
Ice barrier
The state’s climate table marks the ice barrier “yes” statewide. That is a self-adhering membrane, or two cemented layers of underlayment, from the eave to at least 24 inches inside the wall line (IRC R905.1.2).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes)
Wind and snow
Fall River’s code design values are a 128 mph ultimate design wind speed and a 30 psf ground snow load (30 psf minimum flat-roof snow load). At that wind speed the code calls for asphalt shingles labeled ASTM D7158 Class G or H (Table R905.2.4.1).
Source: 780 CMR 51.00, Chapter 3 amendments (Tables R301.2(1) and R301.2(2)); IRC 2021, Chapter 9 (Pennsylvania edition, UpCodes) (780 CMR 51.00, Table R301.2(2))
Rules as read on October 24, 2026. Code edition, permit and contract rules for the whole state: roof replacement in Massachusetts.
Of 41,991 occupied homes in Fall River, 14,824 (35%) are owner-occupied. By year built, 46% before 1940, 63% before 1960, 78% before 1980; 7% went up in 2000 or later. (ACS 2020–2024.)
By building type: 23% detached houses, 45% buildings of two to four units.
On a house built before 1940, ask what the deck is (boards or plywood) and whether slate sits under the later layers: slate can’t be roofed over.
Of the 20 Bristol County municipalities on this site, Fall River has the 4th largest share of homes built before 1980: 78%, against a county range of 37% to 84%.
ZIP codes: 02717 · 02720 · 02721 · 02723 · 02724
| Place | Median built | Before 1980 | Owners | Row, twin | Hail days |
|---|---|---|---|---|---|
| Fall River | 1945 | 78% | 35% | 2% | 6 |
| Somerset | 1962 | 81% | 87% | 2% | 5 |
| Freetown | 1976 | 61% | 86% | 2% | 7 |
| Swansea | 1966 | 73% | 85% | 1% | 6 |
| Dighton | 1975 | 54% | 90% | 3% | 5 |
| Berkley | 1986 | 37% | 97% | 2% | 4 |
Median built: median year the homes were built. Before 1980: share of homes built then. Owners: share of homes that are owner-occupied. Row, twin: share of homes that are rowhouses, twins or townhouses. Census ACS 2020–2024. Hail days: days with hail of 1 inch or larger within 10 miles, 2006–2025, NOAA Storm Prediction Center.
Since 2006 the National Weather Service has logged hail of 1 inch or larger on 6 separate days within 10 miles of Fall River; the largest was 2 in on July 18, 2012. The most recent was August 26, 2024.
That is fewer than most places in the state on this site (median 10 days).
Severe Winter Storm and Snowstorm (DR-4651, April 2022) is the latest of 7 federal storm declarations covering Bristol County since 2006. (OpenFEMA.)
A report says hail fell near Fall River, not that it damaged a roof. When wind or hail damage means a new roof.
HUD’s useful-life figures are for planning; a warranty is a separate promise. For Fall River’s houses: More in the guides to shingles, metal, slate and flat roofs.
| Material | HUD useful life | Fits a house like | Watch for |
|---|---|---|---|
| Asphalt shingles | 20 years | Most pitched roofs; 23% of homes here are detached | Class G or H at 128 mph design wind (IRC Table R905.2.4.1) |
| Metal (standing seam, panels) | 50 years | Roofs that will carry solar later | Standing seam that carries its own loads can skip the tear-off (R908.3.1) |
| Slate | 75 years | Older houses; 46% here predate 1940 | Never a base for a new layer (R908.3.1.1); heavy |
| Flat roof: EPDM or TPO | 15 years | Porches, additions, low-slope rears | Where the roof meets a wall or parapet |
In Fall River the contractor’s HIC registration (M.G.L. c. 142A) and the CSL of the supervisor licensed for roof covering are the two numbers to look up before signing.
The price side is in what a new roof costs in Massachusetts; the paperwork side in checking a roofing contractor.
A permit from Fall River. Roofing is not on the Massachusetts list of work exempt from a permit (780 CMR 51.00, R105.2). Fall River’s building department issues it, and the application carries the contractor’s HIC registration number.
On a roof that already carries two layers, or slate or tile, the code allows no recover: it is a tear-off (IRC R908.3.1.1). 78% of Fall River’s homes were built before 1980; many have been reroofed before.
By the Census Bureau’s American Community Survey (2020–2024), the median home in Fall River was built in 1945, 78% of homes were built before 1980, 35% are owner-occupied.
Hail of 1 inch or larger was reported on 6 days within 10 miles of Fall River from 2006 through 2025 (NOAA Storm Prediction Center). A report means hail fell nearby, not that a roof was damaged.
In Fall River the contractor’s HIC registration (M.G.L. c. 142A) and the CSL of the supervisor licensed for roof covering are the two numbers to look up before signing.
The full list: before you call.
Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.