New Roofing Costs

Deciding

Replacing Your Roof Before Solar Panels Go On

Why the roof under solar panels should outlast them, what the Department of Energy's consumer guide advises about roofs over 15 years old, and what to ask when panels are already up.

New Roofing Costs connects homeowners with independent local roofing contractors. We do not perform roofing work.

Call (833) 781-1806 Replacement and new roofs only · homeowners

This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

A house roof with new dark shingles and a row of new solar panels being mounted on rails on the south-facing slope, sunny day

The rule of thumb

The Department of Energy's consumer guide to home solar, prepared by the National Renewable Energy Laboratory, puts it plainly:

If your roof is more than 15 years old, you may want to consider replacing it when you purchase your solar electric system. Most solar vendors recommend using roofing material that will last as long as the system, which is about 25 to 30 years.

— DOE / NREL, A Consumer Guide to Solar Electricity for the Home

The same guide gives the weight of a system at an estimated 3 to 5 pounds per square foot and says to make sure the roof can hold it.

Roof life against panel life

HUD's useful-life table for capital needs assessments plans asphalt shingles at 20 years, metal at 50, slate at 75 and clay or concrete tile at 60. A shingle roof that is already 15 years old will, by that measure, need replacing well before 25- to 30-year panels are done. Replacing it first means the panels come off once, not twice.

That is also why some homeowners choose metal before solar: at 50 years by HUD's figure, it outlasts the panels. Metal roofing.

If the panels are already up

Replacing a roof under existing panels means taking the panels off, setting them aside, and putting them back. That is electrical work as well as roofing, and the panels' owner has a say:

  • If you lease the panels or buy the power under an agreement, read what the agreement says about removing them, and call the company before you schedule the roof.
  • If you own them, ask who will take them down and put them back, whether that is in the roofing quote, and whether the town needs its own permit for it.

Tell the person on the line that there are panels on the roof.

What to ask

  • How old the roof is, and how many layers it has (a tear-off is required over two layers, IRC R908.3.1.1).
  • Which material will outlast the panels.
  • Who handles the panels, and whether their removal and reinstallation is a line on the quote.

Questions

Should I replace my roof before installing solar panels?

The Department of Energy’s consumer guide suggests considering it if the roof is more than 15 years old, and notes that most solar vendors recommend roofing that will last as long as the system, about 25 to 30 years. Replacing the roof first means the panels come off once, not twice.

How much weight do solar panels add to a roof?

The Department of Energy’s consumer guide estimates a solar system at 3 to 5 pounds per square foot and says to make sure the roof can hold it.

Can a roof be replaced under leased solar panels?

Read what the lease or power agreement says about removing the panels, and call the company before scheduling the roof. Taking panels off and putting them back is electrical work as well as roofing.

Who removes solar panels during a roof replacement?

If you own the panels, ask who will take them down and put them back, whether that is a line on the roofing quote, and whether the town needs its own permit for it. If they are leased, the agreement and the company have a say.

Sources

Checked October 24, 2026. Laws and code editions change; the date says when these were last read at the source.

Call (833) 781-1806 New roofs and replacements · homeowners